The Manufacturing Planning of Installation Series-Parallel Combination Centrifugal Pump Testing Equipment


Perencanaan Manufaktur Instalasi Laboratorium Pengujian Pompa Sentrifugal Kombinasi Seri-Paralel


  • (1)  Edi Widodo            Universitas Muhammadiyah Sidoarjo  
            Indonesia

  • (2) * Rizky Dwi Jayanto            Universitas Muhammadiyah Sidoarjo  
            Indonesia

    (*) Corresponding Author

Abstract

This study discusses the planning in making a centrifugal pump installation with a combination of two series, namely series and parallel. The concept of discussion refers more to the upgrading of the installation system and calculates the estimated processing time needed to test the performance of the results of the installation that has been made. From the results of the research, it was found that for the preparation of series series installation it takes ± 8.5 minutes including the cutting process of materials and component installation, while the time required in making the installation of parallel circuits ± 28 minutes so that the total manufacturing of the two types of series takes 36, 5 minutes. In terms of performance generated from each installation obtained at full aperture where for the series of head series the value obtained is 37.6 m with a flow capacity of 3.25 l / s while for the head value on the parallel pump obtained by 27.7 m with a capacity flow of 3.75 l / s and this pump operates at 2900 rpm. So it can be seen from the results of the head and flow capacity obtained values ​​indicate good pump performance and ready to be used as a practical tool in the laboratory.

Author Biography

Edi Widodo, Universitas Muhammadiyah Sidoarjo

Mechanical Engineering Department

References

Sularso and H. Tahara, Pompa Dan Kompresor, 7th ed. Jakarta, 2000.

N. A. Joseph H. Spurk, Fluid Mechanics (Second Edition), Second Edi. 1967.

R. P. Edi Widodo, “Analysis of pipe diameter variation in axial pumps for reducing head loss,” in IOP Conference Series: Materials Science and Engineering, 2018, doi: https://doi.org/10.1088/1757-899X/403/1/012029.

E. W. Faisal Ansori, “Analysis on Centrifugal Pump Performance in Single, Serial, and Parallel,” J. Energy, Mech. Mater. Manuf. Eng., vol. 3, no. 2, p. 79, 2018, doi:

22219/jemmme.v3i2.6958.

C. A. Sucipriadi, “Optimalisasi Sistem Perawatan Pompa Sentrifugal di Unit Utility,” 2015.

F. M and White, Fluid Mechanics (Sevent Edition). 1979.

F. Ansori and E. Widodo, “Analysis on Centrifugal Pump Performance in Single , Serial , and Parallel,” JEMMME (Journal Energy, Mech. Mater. Manuf. Eng., vol. 3, no. 2, pp. 79–86, 2018, doi: 10.22219/jemmme.v3i2.6958.

T. H. O. Bruce R. Munson, Donald F. Young and W. W. Huebsch, Fundamentals Of Fluid Mechanics (Sixth Edition), Sixth Edit. 2009.

Edi Widodo, “Rekayasa performansi pompa sentrifugal untuk menurunkan head loss,” Universitas Muhammadiyah Sidoarjo, 2016.

W. Fathoni and S. Novianto, “Analisa Aliran Fluida (Fully Developed Flow) Pada Pipa Circular Dengan Menggunakan CFD Fluent,” J. Tek. Mesin UNTIRTA, vol. 4, no. 2, pp. 43–49, 2018.

S. Maulana, “Pemanfaatan Computational Fluid Dynamics (Cfd) Dalama Strategi Penelitian Simulasi Model Pada Teknologi Penghawaan Ruang,” Educ. Build., vol. 2, no. 2, pp. 10–13, 2016, doi: 10.24114/eb.v2i2.4393.

A. F. Ridho Choirul Anam, Edi Widodo, Iswanto, “Comparative Analysis of the Head Loss of Two Centrifugal Pumps in a Fluid Test Laboratory,” R.E.M. (Rekayasa Energi Manufaktur) J., vol. 5, no. 1, pp. 1–8, 2020, doi: 10.21070/r.e.m.v5i1.409.

E. P. Putro, E. Widodo, A. Fahruddin, and I. Iswanto, “Analisis Head Pompa Sentrifugal Pada Rangkaian Seri Dan Paralel,” Media Mesin Maj. Tek. Mesin, vol. 21, no. 2, pp. 46–56, 2020, doi: 10.23917/mesin.v21i2.10671.

Picture in here are illustration from public domain image (License) or provided by the author, as part of their works
Published
2021-08-19
 
Section
Articles