Predictive Maintenance Implementation In Reach Stacker Kalmar Type Drd To Reduce Component Failure


Implementasi Predictive Maintenance Pada Reach Stacker Kalmar Type Drd Untuk Mengurangi Kegagalan Komponen


  • (1) * Ponidi Ponidi            Teknik Mesin, Universitas Muhammadiyah Surabaya  
            Indonesia

  • (2)  Ali Makhfud            Teknik Mesin, Universitas Muhammadiyah Surabaya  
            Indonesia

    (*) Corresponding Author

Abstract

The Reach Stacker lifting tool is the most productive lifting tool for container lifting today. It can move container till 20 container box in every hour, it means that in 3 minutes it can lift and lower 1 box container. In operation the lifting equipment will surely experience a stop operation due to the failure of a component. The purpose of this study was to determine critical and important components of the history of failure data for a year (2016) in PT meratusline, by using tools Fault Tree Analysis, Failure Mode and Effect Analysis and Pareto. From the analysis, it obtained Load Handling component as the most critical component based on the most frequent failure and required a long time to repair. The cause of the failure itself was inconsistent greasing maintenance / Predictive maintenance was not executed and there was no loose handling of Load Handling chain components. From the result of research, it was suggested to make standard rule by adding greasing item in worksheet Predictive maintenance and Standard Operating Procedure Predictive Maintenance for chain replacement on Load Hadling component if already entering 12000 Hour life.

References

British Standard, BS EN 13460:2002, Maintenance Documents for maintenance, BSI, London.

Jim August, “Applied Reliability Centered Maintenance,” Pennwell publishers, 500pp, 1999.

Kelly, A., “Maintenance Strategy,” Business Centred Maintenance, Oxford Butterworth Heinemann, 1997.

Marvin Rausand and A. Heyland, In System Reliability Theory,” 2nd ed. John Wiley & Sons, Inc., Hoboken, New Jersey.p.160, 2004.

Michael V Brown,”Building a PM program brick by brick,” New Standard Institute Inc Publications, 2003.

Mobley, R.K., “Introduction to Preventive Maintenance,” 2nd ed, Butterworth Heinemann, Elsevier, pp 4, 2002.

Narayan, V., “In Effective maintenance management,” New York: Industrial Press Inc. p.33, 2004.

Robson Quinello, Ford Motor Co. Brasil, “Maintenance and Six Sigma,” Web based article, 2003.

Stanley (Stan) T. Grabill, Sigma Breakthrough Technologies, Inc. Web based article, 2001.

http://en.wikipedia.org/wiki/Pareto_analysis (diakses Oktober 2013).

Picture in here are illustration from public domain image (License) or provided by the author, as part of their works
Published
2018-06-29
 
Section
Articles